Performance assessment of framed Structural system retrofitted with Different lateral load resisting elements a Parametric study
Loading...
Date
item.page.authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The principle objective of this project is to analyze the Regular and Irregular
newline(Vertical-VI and Horizontal-HI) building by Linear analysis, Nonlinear
newlineanalysis considering Lateral load resisting system (LLRS) with soil structure
newlineinteraction (Modified Winkler method -MWM and Continuum method-CM)
newlineusing appropriate software.
newlineEarlier most of the multi-storey existing building was designed for gravity
newlineload. However later only linear analysis considering design were adopted.
newlineThe Linear analysis gives results corresponding to Base Forces and
newlineDisplacement up to yield point. Practically speaking an existing building can
newlineresist force beyond yield point also. However this aspect is not identified in
newlinelinear analysis. Further if the building is subjected to Lateral loads, failure of
newlinethe building takes place which needs to be strengthened by providing LLRS
newlineor other techniques. Strengthening the building and analyzing again by
newlineLinear analysis may hardly give results with reduced displacement and
newlinegreater base force up to yield point. In order to predict results beyond yield
newlinepoint, nonlinear analysis such as Pushover analysis should be performed
newlinewhere the results beyond yield point is achieved. The pushover analysis
newlinegives clear picture of different stages of the building before collapse and also
newlineat collapse (i.e., results of base force and displacement with failure states
newlinesuch as A-B, B-IO, IO-LS, and LS-CP). It gives results of Demand and
newlineCapacity of the building also. Observing the results gives an idea to adopt
newlineretrofitting techniques or not. Retrofitting an existing building should be
newlineanalyzed considering the nonlinearity of the materials also. The retrofitting
newlinetechniques like Shear wall and Bracings are adopted in many buildings. The
newlinebuilding is analyzed after retrofitting to compare the results before and after
newlineretrofitting. It is observed that building with provision of LLRS would
newlineenhance the capacity of the building.
newlineIn the present study, existing building of 10 storeys with Fixed and Flexible
newlinebase (MWM and CM) for differ