Strategic oee models for assessing real effectiveness to improve the deployment of manufacturing resources
| dc.contributor.guide | Kannan S M | en_US |
| dc.coverage.spatial | Strategic oee models for assessing real effectiveness to improve the deployment of manufacturing resources | en_US |
| dc.creator.researcher | Nelson raja P | en_US |
| dc.date.accessioned | 2015-04-10T13:09:45Z | |
| dc.date.available | 2015-04-10T13:09:45Z | |
| dc.date.awarded | 30/06/2008 | en_US |
| dc.date.completed | 01/06/2008 | en_US |
| dc.date.issued | 2015-04-10 | |
| dc.date.registered | n.d, | en_US |
| dc.description.abstract | The industries have realized that quality and productivity are newlinedirect reflection on its production system and a good deal of attention has newlinebeen paid recently The goals of TPM include the maximizing of Overall newlineEquipment Effectiveness OEE so as to eliminate equipment failure and newlinedefects The concept of OEE is becoming increasingly popular and has newlinebeen widely used as a quantitative tool essential for measurement of newlineproductivity in manufacturing system The idea behind the measurement of newlineOEE is to have a metric indicating the performance of equipment newline newline | en_US |
| dc.description.note | Reference p.143-154 | en_US |
| dc.format.accompanyingmaterial | None | en_US |
| dc.format.dimensions | 23cm. | en_US |
| dc.format.extent | xxii, 156p. | en_US |
| dc.identifier.uri | http://hdl.handle.net/10603/38939 | |
| dc.language | English | en_US |
| dc.publisher.institution | Faculty of Mechanical Engineering | en_US |
| dc.publisher.place | Chennai | en_US |
| dc.publisher.university | Anna University | en_US |
| dc.relation | p.143-154 | en_US |
| dc.rights | university | en_US |
| dc.source.university | University | en_US |
| dc.subject.keyword | manufacturing | en_US |
| dc.subject.keyword | mechanical engineering | en_US |
| dc.subject.keyword | Strategic oee models | en_US |
| dc.title | Strategic oee models for assessing real effectiveness to improve the deployment of manufacturing resources | en_US |
| dc.title.alternative | en_US | |
| dc.type.degree | Ph.D. | en_US |
Files
Original bundle
1 - 5 of 15
Loading...
- Name:
- 01_title.pdf
- Size:
- 26.38 KB
- Format:
- Adobe Portable Document Format
- Description:
- Attached File
Loading...
- Name:
- 04_acknowledgement.pdf
- Size:
- 20.64 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1