Recruitment for a single grade manpower system with different epochs for decisions and exits
Loading...
Date
item.page.authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Manpower planning is the process of systematically forecasting the future
newlinedemand and supply of employees, through which management determines how the
newlineorganization should move from its current manpower to its desired manpower
newlineutilization. Further human behaviour is highly variable and it is therefore essential to
newlinemodel manpower planning that accommodates population heterogeneity.
newlineThe main objective of the thesis is to study the problem of time to recruitment
newlinefor a single grade manpower system with non- instantaneous exits which forms an
newlineordinary renewal process. Considering a more general setting on wastages and different
newlineconditions on inter-decision times, several stochastic models are constructed. Two
newlineunivariate policies of recruitment based on shock model approach are used. The content
newlineof this thesis is organized in nine chapters. In the first chapter, review of literature
newlinewhich is relevant to the work are presented. The research work carried out by the author
newlineis presented in Chapters 2 to 9 by assuming different conditions on wastages. The
newlineproblem is studied in Chapters 2 when the wastages form a sequence of independent
newlineand identically distributed exponential random variables. While in Chapter 6 this
newlineproblem is studied when the wastages are constantly correlated exponential random
newlinevariables, in Chapter 8 it is studied when the wastages form a geometric process. In
newlinethese chapters the breakdown threshold has only the normal component and univariate
newlineCUM policy is used as recruitment policy. In Chapters 4, 7 and 9 all the assumptions
newlineare same as in Chapters 2, 6 and 8 respectively except for the assumption that the
newlinebreakdown threshold has two components. Stochastic models of Chapters 2 and 4 are
newlinestudied in Chapters 3 and 5 respectively using univariate MAX policy of recruitment.
newlineAnalytical results for the performance measures namely mean and variance of time to
newlinerecruitment are derived. The influence of nodal parameters on the performance
newlinemeasures is studied and relevant findings with the help of numerical