Establishment of Correlation Between Theoretical and Actual Settlement of Shallow Piles Under Static Loading for High Rise Buildings in Different Soil Strata
Loading...
Date
item.page.authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The present study is focused on the evaluation of theoretical pile load
newlinesettlement based on different approaches and analyzed the elimination of actual pile
newlineload test, which is costly and time consuming. The design of the tall building is
newlinenecessary for the assessment with the base foundation requirements and techniques so
newlinethat the ultimate load can be transferred to the subsoil and to make the tall buildings
newlinesafe against all static loadings. A Critical analysis has been made using various
newlinetheoretical, experimental and software approaches to obtain theoretical pile load
newlinesettlement for tall buildings under multiple soil strata. The various studies that claim
newlinethat actual pile settlement is equivalent to theoretical pile settlement, an experimental
newlineinvestigation has been performed. The actual pile load tests were performed at 15 th
newlinebattalion, SAS, Indore over an area of 6 hact. on eleven bore holes with 13.00 m at
newlineshallow depth. Soil samples were collected for all bores and complete investigation
newlinewas made to understand the type of soil. Corrected STP-N values were analyzed
newlinethrough geotechnical investigation reports done at site. Modulus of elasticity of soil
newlineand pile material was evaluated by using corrected STP-N values and decided grade
newlineof pile concrete respectively. Pile stiffness and settlement influence factors were
newlinecalculated by using model graph. Actual and theoretical settlement values were
newlinedetermined on different load range varies from 0 to 150 Tons. Finally a conclusive
newlinetable for all value prediction models for different given SPT-N were used to establish
newlinea correlation. Result shows that there is a positive correlation between theoretical and
newlineactual settlement values and with the application of increment constant, actual
newlinesettlement is equal to theoretical settlement with accuracy for CL and CI soil values.