Optimal Reactive Power Dispatch Using Sine And Cosine Algorithms With Facts Controllers For Solving Optimization Problems
Loading...
Date
item.page.authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Proper management of reactive power resources is essential for the secure and stable functioning of power systems in the standpoint of voltage stability. Themain purpose of optimal reactive power dispatch (ORPD) is to detect the settings of control variables such as the voltage rating of generators, reactive power injection of VAR compensators and tap ratios of the tap setting transformers in order to decrease the grid congestion with one or more objective of minimizing the active power loss for a fixed economic power schedule while taking on a given set of constraints. In this research work, Flexible AC Transmission System (FACTS)controllers named as Static VAR Compensator (SVC) along with Thyristor Controlled Series Capacitor (TCSC) and UPFC are added to the conventional ORPD problem for active power loss minimization with voltage profile improvement and the results are compared for effective control. As well, this research presents the application of sine cosine algorithm (SCA) to find the optimal solution of ORPD (with and without FACTS devices) of power arrangement with different examination systems (Standard IEEE 14-bus, IEEE 57-bus and IEEE 118-bus) with distinct cases such as minimization of active power losses and improvement of voltage profile. Simulation results demonstrate the high tone and accuracy of the proposed algorithm, and considering the quality of the solution obtained, the proposed algorithm appears to be efficient and robust to solve the ORPD problem (with and without FACTS devices) comparing with existing literatures.
newlineTransmission line protection is the most elaborate and challenging function in power system protection. About two-thirds of faults in power systems occur on the transmission line network. The Phasor Measurement Unit (PMU) provide real time measurement of synchronized component sequence voltages and currents in a power system. The main aspect is to measure the impedance at a fundamental frequency between the relay location and the fault point, and to determine whether a fault is internal or external to a protection zone based on the measured impedance. Voltage and current data at the relay location are used for this purpose. The synchronization is achieved through a Global Positioning Satellite (GPS) system, which can provide continuous precise timing at better than the 1 us level. By using an externally derived synchronizing pulse, such as that from a GPS receiver, the measurement could be placed on a common time reference.
newline
newline